BEFORE YOU START




1. Plan ahead
Your SIPs are fully customized, so it is extremely important to plan ahead. Plan for electrical chases in advance to prevent time consuming and sometimes costly or damaging job-site modifications. Plan for equipment needs. Are you installing roof panels or tall gable-end panels? You may need a forklift or crane to unload and install them. When in doubt be sure to ask one of our Xtreme CBS professionals.

2. Organize SIPS when they arrive
Panels shipped from Xtreme CBS are loaded for optimum use of space (to save the customer additional freight charges) and will probably be loaded in chronological order. You'll want to sort the panels by number when they arrive. Find a level spot to store the panels and set wood blocks so the panels are not setting directly on the ground. Be sure to give them sufficient support and always keep SIPs dry during storage covering them with a breathable protective covering.

3. Read the Contruction Guide and follow instructions
We have over 50 years of experience in the building industry and you may use our experience to make your life easier. Our customer service department is available to answer your questions, so call us if any questions come up during the installation process.

4. Protect your SIP panels
Weather is a factor in any building project. Once installed, seal the interior connections with seam tape and use house-wrap to protect the exterior walls from moisture. Make sure all window and door openings are properly flashed and back-fill is properly filled to direct water away from your structure. In addition, Xtreme CBS recommends the use of an air exchanger in all SIP structures.

 

 

 


DO's and don'ts


Tips for Success
To help you get the most satisfaction from your SIP experience, the Structural Insulated Panel Association has put together this list of tips and suggestions so you'll get the best performance from your SIPs.

The Power of Simplicity
SIPs are simple to use. You can order pre-cut panels that arrive on site ready to set in place. Stand them up, fasten them properly, seal all joints, and in a few days your new house is ready for finish work

 

General Principles

Air Movement
All joints must be sealed in such a way to ensure no air infiltration or exfiltration.

Voids
All voids must be filled with appropriate sealants/panel adhesives manufactured to ensure against air movement and moisture intrusion into the building envelope.

Vapor Transmission
Vapor permeability for all SIP panel joints must meet local building codes and/or environmental requirements

DO'S AND DONT'S CONTINTUED

HVAC Design

A HVAC system must be designed to:
Be properly sized to account for the inherent energy efficiency of the structure

Exterior Cladding and Underlayment
Exterior cladding shall include a primary and secondary weather resistive system, e.g., drainage plane. Underlayment is required, e.g., common building paper, non-perforated housewrap.

Handling and Storage
SIPs must be protected from exposure from the elements and must not be stored in direct contact with the ground. SIPs are bulky and heavy. Manpower is enough to move small panels, but larger panels often require a crane or forklift. Here's how to handle material on site:

DO: Set aside a level spot to store panels. Try to organize your panel delivery for efficiency - store panels from the first floor separately from panels for the second floor, and so on. Stack panels so that you can read the identifying marks or labels and find each piece when you need it.

Stacking
DO: Lay panels flat on stickers, no closer than three inches to the ground. Give the panels plenty of support, and don't let them sag - for 8-foot panels, two stickers are enough, but for 12- to 16-foot panels, use three stickers. For longer panels, don't go more than 6 or 8 feet between stickers

Weather Protection
Panels are rated for exterior exposure during construction, but keep them dry when stored on site. Cover them with a loose tarp or sheet of poly.

DON'T: Leave panels exposed to the elements for extended periods

Assembly
For maximum efficiency, it's best to follow an orderly system. Here are a few tips to keep in mind as you start to work:

DO: Study the installation drawings before setting panels.

DO: Set wall plates carefully. Panel skins provide the strength for walls so panel skins must be fully supported. The panel slips over the wall plate, so remember to set your plates a half inch in from the building edge, and leave room where plates meet for the skin to slide by.

DO: Set panels in order. Mark out your wall plates to show where panel edges fall. When setting walls and roofs, it's a good idea to start in corners or valleys and work out - that way, you won't "box yourself into a corner." At wall corners, one panel "stops short" and the other "flies by" - be sure you know which is which, or one wall will be too long and the other too short.

DON'T: Cut wall panel skins horizontally for installation of electrical wiring

DON'T: Cut roof or floor panel skins without contacting your supplier

DO: Always follow the manufacturer's recommended joint sealing techniques. Seal joints as you work. Panel joints must be thoroughly sealed to ensure there is no air infiltration from the outside or exfiltration from the inside. Be sure to follow the manufacturer's recommendations for sealing joints properly.

DON'T: Be afraid to field-trim panels for an exact fit. Contact us when in doubt.

DON'T: Install panel skins in direct contact with concrete. Provide a capillary break between panel skins and concrete
.
DON'T: Install can lights inside the panels

DO: Install plumbing in interior walls. Furr out interior sections for pipes if necessary.

DO: Install standard deterrents to resist termites and carpenter ants such as insect clips and flashing.

DO: Install proper flashing and sealants around all rough openings and penetrations as required

Weather Details
SIPs are durable, but they aren't designed to get wet. Your house needs exterior finishes that protect the structure from water

DO: Use high-quality roofing and siding. High performance asphalt shingles are suitable for use on a SIP roof. Popular siding materials such as steel or tile, vinyl, wood, brick, or fiber-cement are also fine for SIP houses

DO: Use proper underlayment for roofing and siding. SIP walls are airtight without housewrap, but they do need a drainage plane material (either housewrap or asphalt paper works well).

DO: Flash all penetrations. Most windows will eventually leak some water at the window sill; install flashing under and around windows and doors to direct water away from the wall structure. Hose bibs, dryer vents, exterior lights, and the like must also be flashed, as should roof penetrations such as plumbing stacks, chimneys, and skylights.

Interior Comfort
SIP houses are airtight, so they let you control the indoor environment. A modern ventilation system will let you have fresh air when, how, and where you need it.

DO: Provide adequate ventilation to maintain indoor air quality.

DO: Provide a mechanical ventilation system. Passive air infiltration will not be enough to provide indoor air quality. In cold climates, use a heat recovery ventilator; you'll save energy, and the incoming air will be tempered for comfort. In hot, humid climates, an "energy recovery ventilator" is best: these systems take humidity out of the incoming air and transfer it to the exhaust stream, reducing the load on your air conditioner and improving your comfort.

DON'T: Install or use unvented combustion equipment. "Vent free" gas logs, fireplaces, or heaters

DO: Control indoor humidity. High humidity levels can be unhealthy and can damage your building. Set your ventilation system to keep indoor humidity around 40%. Install exhaust fans in kitchens, bathrooms, and laundry rooms to expel moist air as needed. Moisture intrusion through slabs, crawlspaces, and basements can be significant, so make sure your foundation has good drainage and provides for control of moisture vapor are not appropriate for an airtight SIP house.